DATE CLIENT SCOPE OF WORK
26.05.2006BumifocusEmergency work- Protection for exposed pipe at Jalan Johan Setia, Klang, Banting Selangor.
27.12.2007Petronas GasExcavation at NPS24 Lumut Lateral.
31.12.2007Petronas GasExcavation and soil stability at PGU 3 S2.
18.11.2009Petronas GasPipeline repair at Shah Alam, Sitiawan and Gurun regional offices - crane rental, visual inspection, holiday test, adhesion test, coating thickness measurement, handling of line pipes.
25.03.2010Petronas GasLine pipe preservation (PHASE I) for Pasir Gudang and Kuantan Regional Office.- crane rental, visual inspection, holiday test, adhesion test, coating thickness measurement, handling of line pipes.
27.03.2010Petronas GasLine pipe preservation (PHASE I) program for Sitiawan Regional Office.- crane rental, visual inspection, holiday test, adhesion test, coating thickness measurement, handling of line pipes.
27.03.2010Petronas GasLine pipe preservation (PHASE I) for Shah Alam Regional Office.- crane rental, visual inspection, holiday test, adhesion test, coating thickness measurement, handling of line pipes.
27.03.2010Petronas GasLine pipe preservation (PHASE I) for Gurun Regional Office.-. crane rental, visual inspection, holiday test, adhesion test, coating thickness measurement, handling of line pipes.
13.08.2010Petronas GasLine pipe preservation (PHASE II) for Kuantan Regional Office.- crane rental, visual inspection, holiday test, adhesion test, coating thickness measurement, handling of line pipes.
13.08.2010Petronas GasLine pipe preservation (PHASE II) for Pasir Gudang regional office.- crane rental, visual inspection, holiday test, adhesion test, coating thickness measurement, handling of line pipes.
31.10.2010Petronas GasLine Pipe Inspection (PHASE II) for Gurun, Pasir Gudang, Sitiawan and Shah Alam Regional Offices – Crane Rental.
18.11.2010Petronas GasPipeline repair at Shah Alam, Sitiawan and Gurun regional offices - crane rental, visual inspection, holiday test, adhesion test, coating thickness measurement, handling of line pipes.
19.01.2011Petronas GasLine pipe preservation programme (PHASE III) for Gurun, Sitiawan, Shah Alam, Seremban Pasir Gudang, Kuantan, Gudang and Segamat Regional Office.- crane rental, visual inspection, holiday test, adhesion test, coating thickness measurement, handling of line pipes.
29.05.2012Petronas Gas Provision of 45 ton crane and manpower to relocate line pipes at Shah Alam Regional Office.
11.10.2012Petronas Gas Verify gas leak at Perwaja Metering Station, Kemaman.
1.11.2012Petronas Gas Access road repair & excavator rental.
14.11.2012Petronas GasProvision of manpower, materials, consumables & equipment to undertake verification dig-up, pit-depth measurement, coating inspection, STOPAQ application for NPS 24” PD Lateral.
26.11.2012Petronas GasProvision of manpower, materials, consumables & equipment to undertake verification dig-up, pit-depth measurement, coating inspection, STOPAQ application for NPS24 Prai Lateral.
29.11.2012Petronas GasProvision of manpower, materials, consumables & equipment to undertake verification dig-up, pit-depth measurement, coating inspection, STOPAQ application for NPS36 PGU 3 Sector 1 – Sitiawan.
10.12.2012Petronas Gas Provision of 45 ton crane and manpower to relocate line pipes at Shah Alam Regional Office.
11.12.2012Petronas GasProvision of manpower, materials, consumables & equipment to undertake verification dig-up, pit-depth measurement, coating inspection, STOPAQ application for NPS 36” PGU3 Sector 1.
14.12.2012Petronas GasProvision of manpower, materials, consumables & equipment to undertake magnetic particle inspection (MPI) for NPS 24” Port Dickson Lateral.
29.04.2013Petronas Ammonia Provision of manpower & materials to do temporary STOP IT Pipe Repair Clamp™ at Vessel V3-1203 for Petronas Chemicals Ammonia Sdn Bhd.
25.09.2013Petronas Gas Provision of manpower, materials, consumables & equipments to undertake verification dig-up, pit-depth measurement, soil sampling & coating repair for NPS 36” PGU 2 Sector 1, Kuantan.
7.10.2013Petronas Gas Provision of manpower, materials, consumables & equipments to undertake verification dig-up, pit-depth measurement, soil sampling & Clock Spring Enhancement composite repair & STOPAQ for NPS 4” Tioxide Lateral, NPS 12” Optimal, NPS 4” ET & NPS 20” YTL, Terengganu.
11.12.2013Petronas Gas Provision of manpower, materials, consumables & equipments to undertake verification dig-up, pit-depth measurement, NDT & Clock Spring Enhancement composite repair for NPS 36” PGU 2 Sector 1 Pipeline, Johor.