6.08.2003 | Rightgas | Supply and apply POLYKEN tapes for steel pipe riser for GMSB’s service station. |
15.11.2003 | Applied Industrial | Provide manpower and tools to wrap steel pipe riser with POLYKEN tapes at KGNS and Seksyen 34 Shah Alam. |
27.02.2004 | MMC Engineering | Supply and apply POLYKEN tapes for steel pipe riser at AMSTRONG, SUZUKI and CHEE KENG Gas Service Stations, Penang. |
25.08.2004 | Globegas Engineering | Supply and apply POLYKEN tape wrap system inclusive of cathodic protection system for compressed natural gas pipeline, Bangi. |
26.05.2005 | Petronas Gas | Coating defect correlation and repair at PGU 2 Sector 2, in Melaka and NS. |
22.07.2005 | Petronas Gas | Coating repair, excavation and DCVG survey for PGU 3 Sector 1 (CP1 to CP2), Tanjong Karang. |
12.12.2005 | Petronas Gas | Provision of manpower, equipment, tools, materials & consumable to undertake blasting and re-painting works, flange protection system and pipe support insulation at ML 207, PDL 250, TGSL, MLL 1 SL, TKSL, Tangga Batu and Sepang SL. |
20.06.2006 | Petronas Gas | Major repainting work for all piping system and structures at TNB Gelugor Metering Station, Penang for PGB Gurun. |
29.06.2006 | Petronas Gas | Excavation and coating repair for NPS 6 C3/C4 and NPS 36 Loop 1 pipeline in Kerteh. |
8.09.2006 | Globegas | Supply, apply and holiday test for anti corrosion tape (Polyken), at Petronas Station Taman Melawati, Kuala Lumpur. |
17.12.2007 | Safemac Engineering | Supply and apply tape wrap system for NPS6” pipeline for Cogen Expansion project, PP(M)SB Melaka. |
27.12.2007 | Petronas Gas | Manpower, equipment and material to undertake pipeline coating repair for NPS24” Lumut Lateral (Location 1) |
4.01.2008 | Petronas Gas | Manpower, equipment and material to undertake pipeline coating repair for NPS24” Lumut Lateral.(Location 2) |
07.04.2008 | Petronas Gas | Pipeline inspection and coating repair at Bukit Batu, Tronoh, Perak. |
27.06.2008 | Petronas Gas | Coating defect repair for NPS36 PGU 3 Sector 3, NPS 24 Prai and NPS 18 Perlis Lateral. |
21.01.2009 | Petronas Gas | Contract for service to supply and perform painting work for Prai LPG MS (Prai) and MS BV5 (Derang) metering skid for Trans Thailand Malaysia. |
17.03.2009 | Petronas Gas | DCVG correlation work and coating repair for sales gas, propane & butane pipeline from M1 to E.T using STOPAQ wrapping tape system. |
9.11.2009 | Petronas Gas | Coating repair for NPS8” C4, NPS8” C3, NPS4” Tioxide, NPS4” ET Laterals. |
4.12.2009 | Petronas Gas | Excavation for coating repair for C3 pipeline and ET Lateral at CD#42 |
4.12.2009 | Petronas Gas | Excavation for coating repair for C3 pipeline and ET Lateral at CD#43. |
4.12.2009 | Petronas Gas | Excavation for coating repair for C3 pipeline and ET Lateral at CD#45 |
4.12.2009 | Petronas Gas | Excavation for coating repair for C3 pipeline and ET Lateral at CD#46 |
9.03.2010 | Petronas Gas | Coating repair for NPS8” C3 lateral, NPS36” LOOP1 and NPS8” C4 Lateral. |
3.08.2010 | Petronas Gas | Pipeline coating rehabilitation work at KM 45.300 Gemas, NPS 36” PGU 2 Sector 2 FBE coated pipeline. |
2.03.2011 | Petronas Gas | Contract for blasting and re-painting of ML401, ML402, ML403 and ML404 block valve stations, PGU3 Sector 1 for PGB Shah Alam RO. |
4.03.2011 | Petronas Gas | Coating inspection and repair at KP14.5, Lumut Lateral for PGB Sitiawan RO. |
10.04.2011 | Petronas Penapisan (T) | Contract for solvent regent V22505 internal coating services at PP(T)SB |
26.09.2011 | Petronas Gas | Provision of blasting & re-painting for piping & structures, flange protection system, pipe support Insulation and other related civil works at seven metering stations, PGB-TOD Shah Alam. |
30.09.2011 | Petronas Gas | ICDA/ECDA Step 3 (Direct Examination and Coating Repair) for NPS20 EMSB, NPS6 EMSB FUEL, NPS2 PETLIN, NPS2 KSMF, NPS6 PROPANE and NPS6 BUTANE. |
25.01.2012 | Petronas Gas | Provision of surface preparation and coating at KP21.23 NPS36” PGU1 pipeline, Kemaman. |
27.02.2012 | Petronas Gas | Excavation and coating repair for NPS6” Propane & Butane Pipeline. |
2.04.2012 | Petronas Gas | Provision of power tool & application of STOPAQ for NPS 36” PGU1, NPS6” C3/C4 Pipeline at road crossing, near Giant Hypermarket in Kijai. |
6.04.2012 | Petronas Gas | Provision of power tool & application of STOPAQ for NPS 8” Butane pipeline (GPP-ET). |
11.05.2012 | Petronas Gas | Provision of manpower, materials, consumables & equipments to undertake pipeline coating replacement (PCRE) NPS36 PGU1 including excavation, power tooling, STOPAQ material (Total : 17 pipeline spools). |
4.06.2012 | Petronas Gas | Provision of manpower, materials, consumables & equipments to undertake excavation & coating replacement for NPS4” KLIA – NGV Lateral. |
8.08.2012 | Petronas Gas | Onshore Pipeline Inspection & Repair - Provision of power tools and STOPAQ for coating repair works @ damaged 3LPE coated pipeline, GPP4, Kertih. |
9.08.2012 | Petronas Gas | Onshore Pipeline Inspection & Repair - Excavation, UG cable tracing, power tools and coating repair for NPS 2 to NPS6 at GPPA, Kertih. |
15.09.2013 | Petronas Gas | Provision of manpower, materials, consumables & equipments to undertake surface preparation and painting inclusive of pipe support at Connaught Bridge & Shah Alam City Gate. |
12.06.2014 | Petronas Derivatives | Provision of manpower, materials, consumables & equipments to undertake external surface blasting & painting for Tank D-6323, Kertih. |