DATE CLIENT SCOPE OF WORK
25.04.2003Raslow DC interaction test & bonding box installation at PGB – TOD Puchong City Gate.
14.05.2004Peremba ConstructionTo locate coating damage from CH 00 to CH 1900 and CH 500 to CH 700 using direct current voltage gradient technique at Precint 11, Putrajaya.
18.06.2004Petronas Gas CIPS 251km inclusive of PGU2 Sector 2 main line, Serdang lateral, Genting Sanyen lateral, KLIA lateral, NGV lateral, Melaka lateral, Prai lateral, Kulim lateral, Miri and Bintulu distribution lines.
10.08.2004RightgasTo carry out DCVG for NGDS to Balakong FL/DL3.
17.03.2005SGS (Petrotechnical)DCVG survey for buried pipeline within GPP in Kerteh.
5.07.2005Petronas Gas CIPS for 265KM NPS36” LOOP1 and 45KM NPS6” C3/C4 from Kerteh to Gebeng.
22.08.2005Rantau Padu DCVG for buried pipeline at TCOT/OSC, Kerteh for Exxon Mobil.
15.12.2005Rantau Padu Supply of corrosion engineer and corrosion technician to perform cathodic protection inspection at TCOT, OSC Kertih for Exxon Mobil.
16.05.2006Petronas GasDCVG survey for 109KM NPS 36 Loop 1 Pipeline.
15.08.2006Petronas GasCIPS for PGU2 S2 & Loop 2 (35KM X NPS 36 Twin Pipelines) for Segamat RO.
3.10.2006Petronas GasCIPS for PGU2 S1 & Loop 1 at Kuantan RO.
31.10.2006Petronas GasCIPS for 30km of NPS36” PGU3 S1 and excavation work for Shah Alam RO.
16.02.2007Total SterlingDCVG services at GPP B.
15.03.2007Shah ElectricInsulated joint check for ICCP system at Ethylene & Polyethylene plants, Kertih.
2.04.2007Petronas GasCIPS for PGU2 S3 (223KM X NPS 30) for Segamat and Pasir Gudang RO.
25.04.2007Petronas GasCIPS for PGU1 from KP 0 to KP 32 (32KM X NPS 36), Kertih Compressor Station – M1 Station.
25.04.2007Petronas GasDCVG for PGU1 from KP 7 to KP 27 (20KM X NPS 36).
25.04.2007Petronas GasDCVG for PGU1 from KCS to ET (20KM X NPS8).
5.07.2007Petronas GasCIPS for Shah Alam Lateral (3.3KM X NPS 8).
11.07.2007Petronas GasTest post monitoring for NPS30 Connaught Bridge Lateral.
13.11.2007Petronas GasCIPS & DCVG for NPS 20 CUF Lateral.
27.12.2007Petronas GasDCVG for NPS 24 Lumut Lateral.
4.01.2008Petronas GasDCVG for NPS24 Lumut Lateral.
9.01.2008Petronas GasCIPS NPS4 Miri Gas Distribution System, Sector 6.
9.01.2008Petronas GasCIPS NPS6 Miri Gas Distribution System, Sector 2.
9.01.2008Petronas GasCIPS for NPS6 EMSB.
9.01.2008Petronas GasDCVG for NPS 4 / NPS 6 MGDS Sector 6/2.
9.01.2008Petronas GasDCVG for NPS 6 EMSB.
9.01.2008Petronas GasCIPS for Miri Gas Distribution System, Miri.
12.02.2008Petronas GasPipeline current mapping for NPS 4/6 MGDS Sector 6/2.
14.04.2008Petronas Gas DCVG for NPS 24 Prai and NPS 18 Perlis Lateral.
14.04.2008Petronas GasDCVG for NPS 36 PGU 3 S3.
14.04.2008Petronas GasCIPS for MGDS.
27.05.2008Petronas GasCIPS for PGU 1 from ML107 (9KM X NPS 36).
27.05.2008Petronas GasCIPS for PGU 3 S1 (185KM X NPS 36).
27.05.2008Petronas GasCIPS for Lumut Lateral (16.8KM X NPS 24).
9.06.2008Petronas GasDCVG for Pasir Gudang lateral (15KM X NPS30).
9.06.2008Petronas GasDCVG for NPS 36 PGU 1 and NPS 8 C3/C4 KCS to ET.
1.07.2008Petronas GasCIPS and DCVG for NPS 2 Petlin.
1.07.2008Petronas GasCIPS and DCVG for NPS 2 sales gas EMSB to KSMF.
1.07.2008Petronas GasCIPS and DCVG for NPS 6 PGU S1 (Polyplastic).
1.07.2008Petronas GasCIPS and DCVG for NPS 30 PG (White Horse).
1.07.2008Petronas GasPipeline current mapping for NPS 6 EMSB to KSMF.
1.07.2008Petronas GasPipeline current mapping for NPS 2 Petlin.
1.07.2008Petronas GasPipeline current mapping for NPS 6 Polyplastic.
1.07.2008Petronas GasPipeline current mapping for White Horse.
14.07.2008Petronas GasCIPS for NPS 18 Tanjung Langsat (14KM).
21.07.2008Petronas GasCIPS and DCVG for NPS 16 Teluk Kalong Lateral.
23.10.2009Petronas GasCIPS & DCVG survey for 321KM of PGU2 Sector 2 Mainline and Lateral Pipelines (Melaka, Tg Kling, Telok Gong, PD, TG Gemok, Sepang, KLIA, KLIA NGV and Serdang Lateral) and Kerteh City Gate Station.
5.11.2009Petronas GasPCM Survey NPS36” PGU2 Sector 2.
1.12.2009MTBETo perform PCM inspection for pipeline relocating exercise of MTBE plant – storage interconnecting pipeline, Gebeng.
9.12.2009SGS (Petrotechnical)To perform DCVG inspection for crude oil pipeline at ESSO Refinery at Port.
20.01.2010Ethylene MalaysiaDirect current voltage gradient (DCVG), pipeline current mapping (PCM) and close interval potential (CIP) survey on underground pipeline at Ethylene and Polyethylene Plants.
21.01.2010SGS (Petrotechnical)To perform DCVG inspection for crude oil pipeline at ESSO Refinery at Port Dickson.
3.02.2010MTBE MalaysiaCIPS, DCVG and PCM survey at MTBE Plant, PDH Plant, PPM Plant, Port Storage, Jetty and Interconnecting Pipelines, Kuantan.
10.02.2010PP(M)SB TERM CONTRACT for direct current voltage gradient (DCVG), close interval potential survey (CIPS) and soil resistivity survey services for two plus one plus one (2 +1+1) years at PP(M)SB.(Contract Period 10.2.2010 – 9.02.2012).
12.02.2010Petro-VietnamDCVG inspection for 40km of natural gas pipelines in Vietnam.
17.03.2010Petronas GasDCVG survey for C3/C4 pipelines.
17.03.2010Petronas GasDCVG survey for Propane, Butane and Export Terminal Pipelines.
8.04.2010Petronas GasCIPS for 5KM NPS18” Perlis Lateral.
8.04.2010Petronas GasCIPS for 20.1KM NPS18” Perlis Lateral.
11.05.2010Petronas GasCIPS for 234KM of NPS36” PGU2 Sector 1 (M1-MLL112-ML200)
3.08.2010PP(M)SB DCVG survey at PPMSB, Melaka.
13.08.2010Petronas GasCIPS & PCM survey for 24.7KM NPS 8”, 6”, 4” Miri Gas Distribution System.
6.09.2010Petronas GasDCVG with global positioning system for PGU2 Sector 2 Mainline and Lateral Pipelines for OED
7.09.2010Petronas GasPRICE AGREEMENT for close interval potential survey (CIPS) and pipeline current mapping (PCM) for duration of one (1) year for MIS-OED. (Contract Period : 16.09.2010 – 15.09.2011)
7.10.2010Petronas GasCIPS for NPS36” Loop 1 (GPP-M1-MLL112)
7.10.2010Petronas GasPipeline current mapping (PCM) for NPS8” Miri Sector 1 and NPS6” Miri Sector 4.
1.02.2011Intestmal CorporationDCVG on natural gas underground piping at Petronas Fertilizer (Kedah) Sdn. Bhd. Gurun
18.07.2011Petronas Gas CIPS for 227.1KM NPS 36” PGU LOOP2.
21.07.2011Petronas Gas CIPS for 27KM X NPS18” Port Dickson Lateral.
14.08.2011Petronas Gas ECDA indirect inspection step 2 (CIPS & PCM) for NPS20 EMSB, NPS6 EMSB FUEL, NPS2 PETLIN, NPS2 KSMF, NPS6 PROPANE and NPS6 BUTANE.
9.09.2011Petronas Gas DCVG & PCM survey for 71.4KM NPS 36” PGU LOOP 1 and NPS36” PGU2 Sector 1.
13.09.2011Petronas Gas Onshore pipeline inspection & repair – Boat rental
19.09.2011Petronas Gas CIPS for 313KM of NPS 36” PGU3 Sector 2 & 3, NPS12” Gurun Lateral, NPS24” Kulim Lateral and NPS8’ Tronoh Lateral.
29.09.2011Petronas Gas CIPS & PCM Miri Gas Distribution System & Bintulu Lateral.
30.11.2011Petronas GasDCVG & PCM survey for 13.9KM NPS 36” PGU LOOP 1 and NPS36” PGU2 Sector 1.
13.12.2011Petronas Gas Onshore pipeline inspection & repair – Boat rental
28.12.2011Petronas Gas DC interference study for NPS42 GPP5/6 Interconnecting Pipeline,Kerteh
28.12.2011Petronas Gas DC interference study for NPS8 KLIA Lateral, Sepang.
21.02.2012Petronas Gas ONSHORE PIPELINE INSPECTION & REPAIR -CIPS for 104.1KM of NPS30 PGU 2 Sector 3, (ML300-ML305),Segamat
24.02.2012Petronas Gas ONSHORE PIPELINE INSPECTION & REPAIR -CIPS for 24KM of NPS24 Prai Lateral.
21.03.2012Petronas Gas ONSHORE PIPELINE INSPECTION & REPAIR -CIPS for 18KM of NPS30 Connaught Bridge Lateral.
22.03.2012Petronas Gas ECDA Step 2 (CIPS, DCVG, PCM Survey) for NPS4 KLIA NGV Lateral.
26.03.2012Petronas Gas CIPS for NPS30 Plentong to Senoko, Singapore and NPS30 Pasir Gudang Lateral.
27.03.2012Petronas Gas ONSHORE PIPELINE INSPCTION & REPAIR -CIPS for 103.7KM of NPS30 PGU 2 Sector 3 ML305 - Plentong
17.04.2012Petronas Gas ECDA Step 2 (CIPS, DCVG & PCM) for NPS2” LPG, NPS4” dry gas and 10” condensate from GPPA to PP(T)SB
27.08.2012Petronas Gas DCVG & PCM for NPS36” PGU 3 Sector 2&3, NPS24” Kulim Lateral and NPS24” Prai Lateral. (Total length is 34.8 KM)
20.09.2012Petronas GasIndirect Inspection (CIPS, DCVG, PCM Survey) at A2 crossing & install test posts for NPS20” Paka Lateral, NPS36” Paka Loop, NPS2” Petlin, NPS48” Feed Gas, NPS10” Feed Condensate, NPS16” Stabilised Condensate, NPS42” Sales Gas, NPS12” Butane, NPS14” Propane, NPS12” Ethane Interconnecting and NPS12” Ethane, in Kerteh.
2.11.2012Petronas Gas ECDA indirect inspection step 2 (CIPS, DCVG, PCM) for YTL Meter Station, TNB Meter Station, KCG1, KCG2 and Perwaja Meter Station.
2.11.2012Petronas Gas PCM & DCVG for PGU 2 Sector 3, Pasir Gudang Lateral and Idemitsu Lateral.
13.02.2013Petronas Gas CIPS for 17KM of NPS 24” Lumut Lateral.
13.02.2013Petronas Gas CIPS for 13KM NPS 18” Tanjung Langsat Lateral.
13.02.2013Petronas Gas CIPS for 63KM NPS 36” PGU3 Sector 1 for Shah Alam RO (KP 0.0 – KP 63.185)
13.02.2013Petronas Gas CIPS for 121KM NPS 36” PGU3 Sector 1 for Sitiawan RO (KP 63.185 – KP 183.908).
4.03.2013Petronas Gas CIPS, DCVG & PCM survey (ECDA Step 2) for NPS 20” MTBE, NPS 20” CUF, NPS 6” PDH, NPS 4” Polyplastic & NPS 2” BD Pipeline, Gebeng Industrial Area.
21.03.2013Petronas Gas CIPS, DCVG & PCM survey (ECDA Step 2) for NPS 4” Tioxide Lateral, NPS 12” Optimal Lateral, NPS 4” ET & NPS 20” YTL Lateral, Terengganu.
2.05.2013Petronas Gas DCVG, pipe-to-soil measurement, repair monolithic isolation joint, DCVG and test post installation for Tronoh Lateral, Sitiawan.
8.05.2013Petronas Gas EXTERNAL ONSHORE PIPELINE INSPECTION & REPAIR - CP assessment for Kerteh and Pasir Gudang.
8.05.2013Petronas Gas EXTERNAL ONSHORE PIPELINE INSPECTION & REPAIR - Prai Lateral CP assessment – PTS, PCM, MIJ Inspection.
17.05.2013Petronas Gas DCVG survey from KP24.8 to KP32.3, PGU3 Sector 1.
31.12.2013Petronas Gas TERM CONTRACT for corrosion survey services for Sabah & Sarawak Gas Pipeline (SSGP) for 3+1 years (Contract Period 1.06.2014 – 30.5.2017)
4.06.2014Petronas Gas ECDA for NPS 8” Shah Alam NGV Lateral pipeline, Selangor.
9.06.2014Petronas Gas ECDA for NPS 4” White Horse Lateral pipeline, Pasir Gudang.