13.10.2002 |
Embah Engineering |
Engineering, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Comfort Rubber, Taiping. |
23.10.2002 |
Best Wide Corrosion |
Design engineering data acquisition and soil resistivity test for PBAPPSB Water Main’s Hajjah Rahmah ICCP system. |
10.11.2002 |
Excell Oilfield |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to Taima Casting, Senai. |
25.11.2002 |
PB Gas |
Development of Putrajaya – Precint 11 Phase II Project : Cathodic protection works for construction and commissioning of the relocation of NPS 20” Diameter Serdang Lateral for Petronas Gas Bhd. |
9.12.2002 |
Ho Hup Construction Co. |
Cathodic protection monitoring for Putrajaya Precint 2 (Core Island) inclusive of mobilisation, demobilisation, equipment, consumables and report writing. |
24.12.2002 |
Gas Malaysia |
Investigation of low cathodic protection reading & magnesium anode installation at PGW-Area Station 01. |
15.01.2003 |
Raslow |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to Puchong Looping. |
26.02.2003 |
Raslow |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to Seksyen 16, (Phase II) Shah Alam. |
20.03.2003 |
Right Gas |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to Tebrau FL1/DL1, Johor. |
25.03.2003 |
Embah Engineering |
EPCC of SACP system for gas pipeline relocation works at Jalan Ipoh -Butterworth, Kamunting. |
11.04.2003 |
Embah Engineering |
Engineering, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Hyatt Regency Saujana, Subang. |
13.05.2003 |
MMC Engineering |
Engineering, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Beranang FL1/DL1 Package 1, Nilai & Pajam, NS. |
13.05.2003 |
Embah Engineering |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to Kesas Highway Crossing (Reinforcement), Shah Alam. |
16.05.2003 |
Embah Engineering |
Installation of sacrificial CP system for EPCC of NGDS to Hyatt Regency Saujana, Subang. |
22.05.2003 |
Sedia Engineering |
Installation of 48 test posts c/w sacrificial anode groundbeds, reference electrode and spark gap in Nilai, NS. |
23.05.2003 |
Pembinaan Sha |
Engineering, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Nibong Tebal FL1/DL1, Penang. |
17.06.2003 |
K & K Sepadu |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to Teluk Panglima Garang FLI/DLI, Kuala Langat, Selangor. |
24.06.2003 |
Applied Industrial |
EPIC of SACP system for gas pipeline to JW Marriot Hotel and Starhill, Kuala Lumpur. |
24.06.2003 |
Applied Industrial |
EPIC of SACP system for gas pipeline to Duta Plaza, Kuala Lumpur. |
1.07.2003 |
MMC Engineering |
Engineering, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Cheng FL1/DL1 Melaka. |
15.07.2003 |
MMC Engineering |
EPIC of SACP system for gas pipeline to Kao Soap, Acid Chemical International and Danisco factories in Prai. |
20.08.2003 |
Applied Industrial |
EPIC of SACP system for gas pipeline to KGNS, Kelana Jaya. |
5.09.2003 |
Applied Industrial |
SACP system for 20KL LPG underground tank at Ampang Hospital, Kuala Lumpur. |
10.09.2003 |
Right Gas |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to Pasir Gudang Package 1. |
10.09.2003 |
Right Gas |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to Pasir Gudang Package 2. |
10.09.2003 |
Right Gas |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to Pasir Gudang Package 3. |
26.09.2003 |
Embah Engineering |
Replace cathodic protection test station at TP17, Taiping. |
26.09.2003 |
Embah Engineering |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to MCB, Kamunting. |
30.09.2003 |
Electroscon |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to Kluang FL 1/03, Johor. |
1.10.2003 |
Intestmal |
TERM CONTRACT for cathodic protection and DCVG survey for MTBE Plant and Pipelines MTBE-Port Storage.(Contract duration : 1 October 2003-30 September 2005) |
7.10.2003 |
MMC Engineering |
Soil resistivity test, foreign structure test facilities and system installation & commissioning at CH 0.00 and CH 1475, Nilai. |
7.10.2003 |
MMC Engineering |
Supply, install, test and commission SACP system for steel riser at four service stations in Prai 3 & 4. |
7.10.2003 |
MMC Engineering |
Supply, install and commission SACP system to upgrade protection level at test station (TP#8) and three GMB’s service stations in Prai 1 & 2. |
10.10.2003 |
Embah Engineering |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to the Curve, Damansara. |
8.11.2003 |
MMC Engineering |
Design, supply, install and commission SACP system for steel riser service station, Ayer Keroh. |
1.12.2003 |
Raslow |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to Central Sugar, Shah Alam. |
1.12.2003 |
Raslow |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to Seksyen 17, Petaling Jaya. |
13.12.2003 |
Embah Engineering |
Supply, supervise, install and test cathodic protection system at Mont Kiara Service Station, Kuala Lumpur. |
19.12.2003 |
MMC Engineering |
Soil resistivity, engineering design, supply, install and commission SACP system for steel riser service station, Prai. |
6.01.2004 |
Right Gas |
Provision of manpower, equipment, material, consumables to install cathodic protection system for gas pipeline to PREMIUM VEGETABLE OIL, Jalan Timah 2, Pasir Gudang Package 3. |
6.01.2004 |
Right Gas |
Provision of manpower, equipment, material, consumables to install cathodic protection system for gas pipeline to EONLIPIDS, Jalan Keluli 7, Pasir Gudang Package 1. |
6.01.2004 |
Right Gas |
Provision of manpower, equipment, material, consumables to install cathodic protection system for gas pipeline to PGEO, Jalan Tembaga 2, Pasir Gudang Package 2. |
16.01.2004 |
K.S. Tan Engineering |
EPCC of SACP system for NGDS to Pan Pacific Hotel, Glenmarie Shah Alam. |
20.01.2004 |
Embah Engineering |
To supervise and undertake cadwelding works and concrete works to replace damaged Test Post 2, Taiping. |
9.02.2004 |
Excell Oilfield |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to Gebeng FL1/DL1 Stage 1/03, Kuantan. |
20.02.2004 |
Embah Engineering |
Engineering, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Prai FL Stage 1/03, Seberang Prai. |
27.02.2004 |
MMC Engineering |
Soil resistivity, material supply, install and test monitoring facilities at PGB-GMB pipeline crossing in Pajam, NS. |
27.02.2004 |
MMC Engineering |
Supply, install and commission SACP system for steel riser @ service stations (SANCHEM, AMSTRONG 1, POLYGLASS, FOUNDRY AND NAFTHA FACTORIES), Prai Industrial Area. |
1.03.2004 |
Raslow |
Engineering, supply, installation and commissioning of cathodic protection system for EPCC of NGDS to Box Pak Sdn. Bhd. Batu Caves. |
11.03.2004 |
MMC Engineering |
Installation of SACP system for NGDS to PGEO EDIBLE OIL, Prai. |
25.03.2004 |
Diversified |
Design, supply and commissioning of cathodic protection system for EPCC of NGDS to Tampoi & Larkin FL1/DL1 (APOLLO FOOD & UNIVERSAL CABLE), Johor. |
30.03.2004 |
MMC Engineering |
To replace, relocate all underground CP device and test facilities at Jalan Batang Benar and Pajam, NS. |
8.04.2004 |
MMC Engineering |
EPIC of CP system for NGDS to KL Bangi Looping, Serdang. |
9.04.2004 |
Konsortium Yeong |
Repair of GMSB CP Test Post along Jln Haji Sirat, Meru, Klang. |
21.04.2004 |
Right Gas |
Supply and installation of SACP system at Balakong inclusive of Close Interval Potential (CIP) Survey. |
21.04.2004 |
Right Gas |
Provision of manpower, equipment, material, consumables to install cathodic protection system for NGDS to Kulai FL Stage 1/04, Johor. |
21.04.2004 |
Right Gas |
Provision of manpower, equipment, material, consumables to install cathodic protection system for NGDS to GUAN CHONG COCOA, Pasir Gudang. |
26.04.2004 |
MMC Engineering |
Design, supply, supervision and commission of CP system for NGDS to Dengkil FL Stage 1/03. |
20.05.2004 |
Eurowide |
Construction of roadworks, roadside drains, sewer reticulation and sewage pump station (RP2) for package 2 at proposed integrated township development of Bandar Bukit Raja (Stage 1) on lots 19, 25, 27, 52, 1635, 13046 & 13047, Mukim Kapar, Daerah Klang. -Relocation and re-position of test post for Bukit Raja Main Infra Project at Jalan Haji Sirat, Klang. |
25.05.2004 |
MMC Engineering |
EPIC of CP system for pipeline underneath tarred road, Dengkil. |
26.05.2004 |
Embah Engineering |
Engineering, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Kelana Jaya DL Stage 1/03, Selangor. |
10.06.2004 |
Changkat Ressam |
EPIC of SACP for 3600m of NPS 6”, Nilai Industrial Area. |
21.06.2004 |
SAAG - Embah |
Engineering, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Pasir Gudang Stage 2/03, Johor. |
21.06.2004 |
MMC Engineering |
Engineering, supply, supervision and commissioning of cathodic protection system for NGDS to PETRONAS NGV Station, UPM. |
30.06.2004 |
MMC Engineering |
Relocate Petronas Gas test station, Beranang. |
30.07.2004 |
Pembinaan Sha |
Cathodic protection subcontract for NGDS to Malayawata, Prai. |
14.08.2004 |
Right Gas |
Cathodic protection upgrading works and Close Interval Potential (CIP) Survey. |
9.09.2004 |
Electroscon |
EPIC of SACP system for NGDS to Batu Caves FL Stage 1/04, Selangor. |
29.09.2004 |
Masmirin |
Engineering, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Nibong Tebal (Additional Works). |
18.10.2004 |
Changkat Ressam |
EPIC of SACP system for gas pipeline to Nilai Industrial Area. |
18.10.2004 |
Rightgas |
Replace magnesium anode at GROBEST Service Station. |
18.10.2004 |
Rightgas |
Relocate PETRONAS GAS test post station at PGU Right of Way and provision of resistive bond box at GMB-PGB inter-pipeline crossing, Tebrau. |
18.10.2004 |
Rightgas |
Replace magnesium anode at IFFCO Service Station. |
18.10.2004 |
Rightgas |
Supply, installation and commission additional CP system for NPS6” from CH275B to CH390B at Jalan Tembaga 2, Pasir Gudang. |
18.10.2004 |
Rightgas |
Investigate and rectify damaged cables at Test Station TS#5 along Jalan Besi 1, Pasir Gudang. |
18.10.2004 |
Rightgas |
EPIC of CP System to Pasir Gudang & Johore Port FLDL Stage 1/04, Johor. |
18.10.2004 |
Rightgas |
NGDS to Senai DL Stage 1/04, Johor |
18.10.2004 |
Diversified Engineering |
Engineering, supply, supervision and commissioning of cathodic protection system for NGDS to Kamunting FL DL Stage 1/03, Perak. |
26.11.2004 |
Diversified Engineering |
Engineering, supply and commissioning of cathodic protection system for NGDS to Convention Centre, Precint 5, Putrajaya. |
26.11.2004 |
Diversified Engineering |
Engineering, supply and commissioning of cathodic protection system for NGDS to Johor Port FL/DL Stage 1/03, Johor. |
12.12.2004 |
Diversified Engineering |
Engineering, supply and commissioning of EPCC of NGDS to Bukit Kemuning FL Stage 1/04, Selangor. |
22.12.2004 |
Applied Industrial |
Supply, install, testing and commissioning of cathodic protection system for NGDS to Shah Alam FL DL Stage 1/04 Seksyen 26. |
22.12.2004 |
Diversified Engineering |
Engineering, supply, supervision and commissioning of cathodic protection system for NGDS to Takeuchi, Tebrau. |
22.12.2004 |
Masmirin |
Engineering, supply, supervision and commissioning EPCC of NGDS to Kuantan Port FL Stage 1/04, Pahang. |
7.01.2005 |
Right Gas |
EPIC of cathodic protection system for NGDS to Skudai & Tampoi FL Stage 1/04, Johor. |
10.01.2005 |
DEC |
Design, supply and commission CP system for PNGV Telok Panglima Garang . |
12.01.2005 |
Peremba Construction |
Subcontract for the cathodic protection design engineering and system commissioning for Melut Basin Oil Development Project, Sudan. |
15.02.2005 |
Petronas Penapisan (T) |
TERM CONTRACT for inspection and maintenance of cathodic protection system at Kerteh Refineries (KR1 and KR2 Plants), 3+1 Year Contract. |
17.02.2005 |
Inter Region |
Soil resistivity test and CP design for gas pipeline relocation works at Taman Putra, Kluang. |
18.02.2005 |
Diversified Engineering |
Engineering, supply, supervision and commissioning of cathodic protection system for NGDS to Apollo Food and Universal Cable |
18.02.2005 |
Diversified Engineering |
Engineering, supply, supervision and commissioning of cathodic protection system for NGDS to Kemuning FL stage 1/04, Bukit Kemuning, Klang, Selangor. |
25.02.2005 |
Applied Industrial |
EPIC of SACP for NGDS to Alor Gajah FL DL Stage 1/04. |
1.03.2005 |
Petronas Gas |
Cathodic protection services for PGU2 Sector 1, Loop 1, PGU 2 Sector 2, Loop 2, CP1 Jeram to CP2 Tg. Karang for MIS technical department ,PGB-TOD Segamat. |
17.03.2005 |
Total Sterling |
Provision of upgraded CP design inclusive of site assessment, pipe to soil potential, soil resistivity test, for PD Lateral/Loop Pipelines for PGB Seremban. |
17.03.2005 |
Intestmal |
EPCC of new impressed current cathodic protection anode ground bed at CP2 Kuala Kuantan for PGB Kuantan RO. |
21.03.2005 |
PFC Engineering |
EPCC of cathodic protection system for PASB OSBL Piping Project, Kerteh. |
22.03.2005 |
Inter Region |
Undertook current drainage test at HDD Pipeline Section at Taman Putra, Kluang. |
23.03.2005 |
MMC Engineering |
Installation of CP system for EPCC of NGDS to Cheng FL1/DL1 Melaka. (Additional works). |
29.03.2005 |
MTBE Malaysia |
Repair of pipeline cathodic protection cable for test point TSS 8A (Pipeline MTBE – Port Storage). |
30.03.2005 |
MMC Engineering |
EPCC of NGDS to Beranang Package 1, Nilai & Pajam, Negeri Sembilan. |
28.04.2005 |
Bumi Focus |
EPIC of cathodic protection system for EPCC of NGDS to Senai FL Stage 1/05, Johor. |
3.05.2005 |
Peremba |
Provision of manpower , tools, equipment and material to carry out the cathodic protection system installation and supervision for tank base for Marine Terminal Facilities in Sudan. |
22.05.2005 |
Bumi Focus |
Relocation of CP test post along Jalan Haji Sirat, Meru, Klang. |
27.05.2005 |
PBJV |
Engineering, supply and commissioning of SACP system for NGDS to Ayer Keroh FL DL Stage 1/05, Melaka. |
27.05.2005 |
PBJV |
Engineering, supply and commissioning of SACP system for NGDS to Batu Berendam FL DL Stage 1/05, Melaka. |
8.06.2005 |
Masmirin |
Design, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Prai FL Stage 1/05, Prai. |
9.06.2005 |
Bumi Focus |
EPIC of cathodic protection system for EPCC of NGDS to Senai FL Stage 1/05, Johor. |
9.06.2005 |
Inter Region |
Supply, install, and commission SACP for gas pipeline relocation works at Taman Putra, Kluang. |
13.06.2005 |
Masmirin |
Design, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Sitiawan, FL Stage 1/05, Sitiawan. |
16.06.2005 |
Petronas Gas |
Cathodic protection services for NPS 36 PGU Loop 1 pipeline from Kerteh Compressor Station, Kerteh-ML200 Segamat and NPS 6 Propane and Butane Pipeline from M1 Teluk Kalong to MTBE Station in Gebeng. |
4.07.2005 |
Misi Setia Oil & Gas |
Design, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Sitiawan FL Stage 2/05. |
4.07.2005 |
True Features |
Design, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to PJ FL Stage 1/05, Petaling Jaya. |
4.07.2005 |
Bumifocus |
EPIC of cathodic protection system for EPCC of NGDS to Segambut FL Stage 1/05, Kuala Lumpur. |
8.07.2005 |
Right Gas |
Cathodic protection system for HDD pipeline section, Skudai. |
8.08.2005 |
Haven Corrosion |
Engineering, supply, supervision and commissioning of cathodic protection system for EPCC of CP System for Town Water and Fire Water at Tanjung Bin Power Plant. |
12.08.2005 |
Bumifocus |
EPIC of cathodic protection system for EPCC of NGDS to Kossan Rubber, Meru, Klang. |
29.08.2005 |
Masmirin |
Design, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Nibong Tebal FL Stage 1/05. |
14.09.2005 |
Petronas Gas |
Contract for PCC of new impressed current cathodic protection system at CP10 Kg. Sega, Seremban. |
19.09.2005 |
Masmirin |
Design, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Prai FL Stage 3/04, Seberang Prai. |
7.11.2005 |
Pembinaan Naga |
Cathodic protection for internal pipeline at Southern Steel, Prai Industrial Area, Penang. |
25.11.2005 |
Bumifocus |
EPIC of cathodic protection system for EPCC of NGDS to Tebrau DL Stage 1/05, Johor. |
13.12.2005 |
Petronas Gas |
Supply, delivery, replace, install, test and commission new CP test posts for PGB-TOD Shah Alam. |
28.01.2006 |
Rantau Padu |
Commissioning of CP system for Effluent Water Surge Tank A & B at TCOT, Kerteh for Exxon Mobil. |
5.02.2006 |
Local Engineering |
Complete CP system audit survey (CIPS, DCVG, interference test, potential measurement) and repair works at Onshore Gas Terminal, Kerteh for Petronas Carigali Sdn Bhd. |
8.02.2006 |
Masmirin |
Design, supply, supervision and commissioning of cathodic protection system for EPCC of the NGDS to Prai FL DL Stage1/05. |
15.02.2006 |
Safemac |
EPIC of impressed current cathodic protection system for fire water and oily sewer water piping at PP(M)SB Co-Generation Plant, Melaka for PP(M)SB, Melaka. |
3.03.2006 |
Changkat Ressam |
Improvement of pipe-to soil-potential at GOODWAY, in Nilai. |
8.03.2006 |
Bumifocus |
Supply manpower and material/consumables to upgrade CP system in Senai. |
21.04.2006 |
MMC Engineering |
Design and commissioning of CP system for pipeline installation to CAMPBELL. |
2.05.2006 |
PBJV Group |
Supply, install, test additional CP system at Ayer Keroh FL Stage 1/05 complete with CIP survey. |
19.05.2006 |
Petronas Gas |
Contract for EPIC of replacement of existing impressed current cathodic protection anode groundbed with new anode groundbed for CP#2 Tenang, Labis, Johor. |
31.05.2006 |
Misi Setia Oil & Gas |
Design, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Prai FL Stage 1/05 & FL DL Stage 1/05 (LOOPING 1 & LOOPING 2), Prai. |
15.06.2006 |
MMC Engineering |
Cathodic protection rectification works for EPCC of NGDS to Ayer Keroh FL1/DL1. |
15.06.2006 |
Masmirin |
Design, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Kulim Hi-Tech FL Stage 1/06, Kulim. |
15.06.2006 |
MMC Engineering |
Cathodic protection rectification works for NGDS to Beranang FL DL Stage 1/05. |
15.06.2006 |
MMC Engineering |
Cathodic protection rectification works for NGDS to Cheng FL1/DL1, Melaka. |
9.08.2006 |
Petronas Gas |
SERVICE AGREEMENT corrosion control for underground pipeline for a period of two (2) years with an extension for another one (1) year for PGB-Transmission Operation Division, Segamat. |
15.08.2006 |
Petronas Gas |
CP Enhancement of NPS 18” PD Lateral Pipeline at TTJ Power Station, Port Dickson. |
18.09.2006 |
Misi Setia Oil & Gas |
Design, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Klang FL Stage 1/06 (Reinforcement) Jalan Johan Setia, Klang. |
3.10.2006 |
Petronas Gas |
Magnesium ribbon installation for NPS36 PGU 2 Sector 1 & LOOP 1 pipelines at Sg. Ular & Kuala Kuantan. |
30.01.2007 |
Total Sterling |
Inspection of GPP B cathodic protection system (tank and fire water pipeline) and rectification works. |
14.02.2007 |
Hablem Oil & Gas |
Inspection and maintenance works of CP system at PROTON, Shah Alam. |
28.02.2007 |
Total Sterling |
EPIC of ICCP anode groundbed installation at CP Station Export Terminal, Telok Kalong for Petronas Gas - Kertih RO. |
5.03.2007 |
Petronas Gas |
EPIC of test post installation at PGU1, PGU2 and Loop 1 mainlines, for Kertih RO. |
7.03.2007 |
Alam Gas |
Inspection of cathodic protection system at First World Hotel, Genting Highland. |
27.06.2007 |
Ikon Subsea |
Provision of cathodic protection system services for PCC 2 Labuan Gas Terminal (LGAST) & pipeline project, Labuan for Petronas Carigali Sdn. Bhd. |
5.07.2007 |
Petronas Gas |
Resistive bonding for NPS8 Shah Alam NGV Lateral. |
22.07.2007 |
Total Sterling |
Supply, replace and commission the underwater sacrificial anode for CP system at Export Terminal Jetty, Telok Kalong. |
30.07.2007 |
MTBE Malaysia |
Contract for EPIC of MTBE, PDH and PPM plant cathodic protection revamp work. |
10.08.2007 |
Petronas Gas/td>
| Magnesium ribbon installation for NPS36-inch PGU 1. |
10.08.2007 |
Petronas Gas |
Magnesium ribbon installation for NPS36-inch PGU 1. |
10.08.2007 |
Petronas Gas |
Magnesium ribbon installation for NPS8-inch C3/C4 KCS to ET. |
20.08.2007 |
Inter Region |
Replacement and relocation work of cathodic protection post at Tronoh, Perak. |
20.08.2007 |
Misi Setia |
Design, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Ijok- Sg. Buloh Looping Stage 1, Selangor. |
30.01.2008 |
Petronas Gas |
Magnesium ribbon installation for NPS8 C3/C4 KCS to ET. |
31.01.2008 |
Sidenco |
EPIC of cathodic protection system for engineering, procurement, construction & commissioning of Ethane Supply Reliability Improvement to OPTIMAL Project. |
31.01.2008 |
Petronas Gas |
Magnesium ribbon installation for NPS 36 PGU 1. |
23.02.2008 |
Safemac |
EPIC of ICCP system for underground pipeline for Cogen Expansion project for PP(M)SB, Melaka. |
9.04.2008 |
PFCE-CG |
YEARLY TERM CONTRACT (3+1) for cathodic protection services at OPTIMAL (M) Sdn Bhd, Kerteh, Kemaman. |
20.05.2008 |
Petronas Gas |
EPCC of SACP system for underground pipelines at Gas Processing Plant, Complex B. |
29.05.2008 |
Inter Region |
Replacement & relocation work of cathodic protection test post at Tronoh, Perak. |
27.06.2008 |
Misi Setia |
Design, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Telok Kalong FL Stage 1/08, Telok Kalong, Kemaman, Terengganu. |
4.08.2008 |
Petronas Gas |
CP Verification on Prai & Gelugor and Prai Lateral. |
8.10.2008 |
Masmirin |
Engineering, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Kulai FL Stage 2/08, Kulai, Johor. |
16.02.2009 |
Optimal Olefin |
Contract for provision of engineering, procurement, construction & commissioning services for capacity increase of cathodic protection system project. |
22.03.2009 |
PFCE-CG |
Cathodic protection cross bonding installation at MeOH and H2SO4 pipelines. |
07.05.2009 |
Masmirin |
Mobilisation & demobilisation of CP engineer to conduct pre-comm and commissioning of CP system for Stage 2 &3 pipelines. Kulai, Johor. |
19.05.2009 |
Petronas Gas |
PRICE AGREEMENT for corrosion services for PGB TOD pipeline systems for a period of two (2) years with an option to extend of one (1) Year. (Contract Period : 1.6.2009 – 31.5.2011). |
23.07.2009 |
Fusionspace |
Engineering, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Taman Makmur FL Stage 1/08,Kulim, Kedah. |
5.11.2009 |
Petronas Gas |
Sacrificial ribbon anode installation and CIP survey for NPS16” Telok Kalong Lateral and NPS4” Export Terminal Lateral. |
26.11.2009 |
Fusionspace |
Engineering, supply, supervision and commissioning of cathodic protection system for EPCC of NGDS to Sungai Petani FL Stage 1/09,Sg Petani. |
24.02.2010 |
Petronas Gas |
Test post installation for NPS30 PGU2 Sector 3. |
2.03.2010 |
Petronas Gas |
Sacrificial ribbon anode installation and CIP survey for NPS16” Telok Kalong Lateral, NPS6” C3 Lateral and NPS4” Export Terminal Lateral. |
17.03.2010 |
Petronas Gas |
Test post installation for C3/C4 and Export Terminal Lateral. |
23.04.2010 |
Applied Industrial |
EPIC of cathodic protection system for gas pipeline at Precint 11 –Stage 2, Putrajaya. |
25.05.2010 |
Applied Industrial |
EPIC of cathodic protection system for Buried 20KL LPG Storage Tank at Intermark Mall, Kuala Lumpur. |
1.06.2010 |
Petronas Gas |
Repair CP1 Sungai Ular, Cherating. |
13.07.2010 |
PP(T)SB |
Contract for design, supply, installation, testing and commissioning of impressed current cathodic protection system for D919 & D920 aboveground storage tanks. |
4.03.2011 |
Petronas Gas |
CP test post repair & maintenance for Pasir Gudang Regional Office. |
15.5.2011 |
Optimal Chemical |
TERM CONTRACT for provision of cathodic protection plant preventive maintenance for a duration of 2 years (15.5.2011 – 14.5.2013). |
16.5.2011 |
Petronas Gas |
PRICE AGREEMENT for corrosion services & line pipe preservation program for PGB TOD pipeline systems for a period of two (2) years with an option to extend of one (1) Year. (Contract Period : 1.6.2011 – 31.5.2013). |
22.07.2011 |
Applied Industrial |
EPIC of cathodic protection system for gas pipeline at Precint 8, Putrajaya. |
16.08.2011 |
Petronas Gas |
Excavation & test post installation for ML112-ML200 |
16.08.2011 |
Gas Malaysia |
To supply, install, test and commission 24 missing SACP systems at Bestari Jaya, Bukit Badong and Ijok, Kuala Selangor. |
29.09.2011 |
PP(M)SB |
Contract for refurbish cathodic protection system at Marine Jetty CB1 – LPG for PP(M)SB. |
29.09.2011 |
Petronas Penapisan |
Contract for provision of cathodic protection system deepwell groundbed repair works at Process/Utility Units for PP(M)SB |
20.10.2011 |
Petronas Gas |
MINOR ONSHORE FABRICATION – CIVIL ENGINEERING - To replace & install new CP test post for Shah Alam Regional Office. |
2.11.2011 |
Petronas Gas |
SACP system for PGU2 Sector 2 Mainline. |
30.11.2011 |
Aqeel Engineering |
Contract for cathodic protection services at Petronas Gas Bhd, Bandar Indera Mahkota, Kuantan. |
28.12.2011 |
Petronas Gas |
Installation of test post for SACP system, NPS36” ML207 – Port Klang Metering Station. |
14.02.2012 |
Petronas Gas |
Onshore pipeline inspection & repair – Test post installation at MLL112 – ML200. |
16.03.2012 |
Pahlawan Power |
Maintenance of cathodic protection system at Tanjung Kling Power Station, Melaka. |
29.03.2012 |
Seri Ibai Enterprise |
Cadangan membina dan menyiapkan jalan masuk utama ke Bandar Kijal, Kemaman - cathodic protection mitigation system for PGU pipeline system under road crossing. |
23.05.2012 |
Petronas Gas |
Contract for design, excavation, material supply & installation of pre-packaged magnesium anodes at Gas Processing Plant, Complex B. |
29.05.2012 |
Optimal Chemicals |
Contract to perform troubleshooting for CP system at EOG Cooling Water Piping (CW & CWR pipeline) & Tank D-6907 due to insufficient protection. |
14.08.2012 |
Petronas Gas |
EPIC of new impressed current anode groundbed at Airstrip CP Station, Miri. |
29.08.2012 |
Petronas Gas |
Contract for EPIC of SACP system at Gas Processing Plant Complex A, Kerteh. |
18.09.2012 |
PAC Builders |
Provision of manpower, equipment, material, consumables and tools to undertake reference electrode & test post installation at AMC – PGB Road Crossing at Lot 24 AMC, Gebeng. |
1.11.2012 |
Petronas Gas |
PRICE AGREEMENT for engineering, procurement, installation and commissioning of new distributed anode ICCP systems for underground piping at station’s TOD, PGB for a period of two (2) years with an option to extend another one (1) year. |
8.11.2012 |
Petronas Gas |
Excavation and test post installation at KP107, PGU2 Sector 1 Pipeline, Segamat RO. |
9.04.2013 |
ML Sepakat Sdn Bhd |
Design, engineering, supply material & installation of cathodic mitigation equipment in Kempas, Johor. |
7.07.2013 |
Petronas Derivaties |
TERM CONTRACT for provision of cathodic protection plan preventive maintenance (PPM) at PCDSB for 2 years.(10.7.2013 – 9.07.2015) |
25.07.2013 |
Lembaga Air Perak |
Design, supply, install & commissioning for cathodic protection mitigation work for PGB gas pipeline crossing with 400mm diamater M.S pipe at Sg Limau, Trong, Taiping, Perak. |
16.12.2013 |
PBJV Group |
EPIC of CP system & AC Mitigation for EPCC of Prai II Lateral Gas Pipeline Project for PGB. |
2.01.2014 |
Petronas Gas |
Supply, installation & commissioning CP test post and reference electrodes at Lot Q Crossing, Kertih. |
19.03.2014
| Applied Industrial |
Design, supply, installation & commissioning of cathodic protection system at Palm Mall, Seremban. |
2.07.2014
| Applied Industrial |
Design, supply, installation & commissioning of cathodic protection system at UIAM Campus, Kuantan. |
7.07.2014 |
PBJV Group |
Provision of ICCP & magnesium anode system for Dalak pipeline project in Sabah & Labuan for Petronas Carigali Sdn. Bhd. |
7.08.2014 |
Petronas Derivatives |
Specialised CP survey for tank bottom D9001, D4004 & D4005 at Utility Area. |